With this thesis, a technical-economic feasibility study was carried out on the installation of a second cogeneration engine in the Osimo thermoelectric plant. This engine aims to significantly increase the production of thermal and electrical energy deriving from the cogeneration process, increasing both the overall energy efficiency and the profits of the plant. The new cogenerator will be installed in parallel to the existing cogenerator, activating according to the thermal demand of the network and always leaving the activation priority to the main cogenerator. The other purpose of this paper is to verify how the thermal storage, installed and put into operation in October 2021, has improved the overall energy efficiency of the plant and increased its economic revenues. The storage is interposed between the cogenerator and the Osimo district heating network and allows the cogenerator to have a better elasticity tracking the thermal request. This made it possible to increase the number of operating hours of the cogenerator with a relative increase in thermal and electrical energy produced by the cogeneration process. The work of this document was carried out at the company Astea S.p.A. at the Recanati (MC) headquarters. In the initial part of the work the concepts of cogeneration, thermal energy, district heating, white certificates, storage systems were discussed and the Osimo production plant was presented. Subsequently, the choice and location of the cogeneration engine that will be installed was discussed. Energy balances were then carried out for both the new cogenerator and the existing storage. Finally, the economic balance was carried out for both case studies.

Con il presente elaborato di tesi si è effettuato uno studio di fattibilità tecnico-economica sull’istallazione di un secondo motore cogenerativo nella centrale termoelettrica di Osimo. Questo motore ha lo scopo di aumentare sensibilmente la produzione di energia termica ed elettrica derivante da processo di cogenerazione, incrementando sia l’efficienza energetica globale che gli utili della centrale. Il nuovo cogeneratore verrà installato in parallelo al cogeneratore già esistente, attivandosi in funzione della richiesta termica della rete e sempre lasciando la priorità di attivazione al cogeneratore principale. L’altro scopo di questo elaborato è quello di verificare come lo storage termico, installato e messo in funzione nell’ottobre del 2021, abbia migliorato l’efficienza energetica globale della centrale e incrementato i suoi ricavi economici. Lo storage è interposto tra il cogeneratore e la rete di teleriscaldamento di Osimo e consente al cogeneratore di avere una migliore elasticità d’inseguimento della richiesta termica. Ciò ha permesso di aumentare il numero di ore di funzionamento del cogeneratore con relativo aumento di energia termica ed elettrica prodotta da processo di cogenerazione. Il lavoro di tale elaborato è stato svolto presso l’azienda Astea S.p.A. nella sede di Recanati (MC). Nella parte iniziale del lavoro sono stati trattati i concetti di cogenerazione, energia termica, teleriscaldamento, certificati bianchi, sistemi di accumulo ed è stata presentata la centrale di produzione di Osimo. Successivamente, è stata trattata la scelta e la posizione del motore cogenerativo che verrà installato. A seguire sono stati svolti i bilanci energetici sia per il nuovo cogeneratore che per lo storage già presente. Infine, è stato svolto il bilancio economico per entrambi i casi di studio.

ANALISI TECNICO-ECONOMICA DI UN NUOVO CHP DOTATO DI ACCUMULO TERMICO INSERITO NELLA CENTRALE DI COGENERAZIONE E TELERISCALDAMENTO DI OSIMO.

d'AMELIO, ADRIANO
2021/2022

Abstract

With this thesis, a technical-economic feasibility study was carried out on the installation of a second cogeneration engine in the Osimo thermoelectric plant. This engine aims to significantly increase the production of thermal and electrical energy deriving from the cogeneration process, increasing both the overall energy efficiency and the profits of the plant. The new cogenerator will be installed in parallel to the existing cogenerator, activating according to the thermal demand of the network and always leaving the activation priority to the main cogenerator. The other purpose of this paper is to verify how the thermal storage, installed and put into operation in October 2021, has improved the overall energy efficiency of the plant and increased its economic revenues. The storage is interposed between the cogenerator and the Osimo district heating network and allows the cogenerator to have a better elasticity tracking the thermal request. This made it possible to increase the number of operating hours of the cogenerator with a relative increase in thermal and electrical energy produced by the cogeneration process. The work of this document was carried out at the company Astea S.p.A. at the Recanati (MC) headquarters. In the initial part of the work the concepts of cogeneration, thermal energy, district heating, white certificates, storage systems were discussed and the Osimo production plant was presented. Subsequently, the choice and location of the cogeneration engine that will be installed was discussed. Energy balances were then carried out for both the new cogenerator and the existing storage. Finally, the economic balance was carried out for both case studies.
2021
2022-10-25
TECHNICAL-ECONOMIC ANALYSIS OF A NEW CHP EQUIPPED WITH THERMAL STORAGE INSERTED IN THE OSIMO COGENERATION AND DISTRICT HEATING STATION.
Con il presente elaborato di tesi si è effettuato uno studio di fattibilità tecnico-economica sull’istallazione di un secondo motore cogenerativo nella centrale termoelettrica di Osimo. Questo motore ha lo scopo di aumentare sensibilmente la produzione di energia termica ed elettrica derivante da processo di cogenerazione, incrementando sia l’efficienza energetica globale che gli utili della centrale. Il nuovo cogeneratore verrà installato in parallelo al cogeneratore già esistente, attivandosi in funzione della richiesta termica della rete e sempre lasciando la priorità di attivazione al cogeneratore principale. L’altro scopo di questo elaborato è quello di verificare come lo storage termico, installato e messo in funzione nell’ottobre del 2021, abbia migliorato l’efficienza energetica globale della centrale e incrementato i suoi ricavi economici. Lo storage è interposto tra il cogeneratore e la rete di teleriscaldamento di Osimo e consente al cogeneratore di avere una migliore elasticità d’inseguimento della richiesta termica. Ciò ha permesso di aumentare il numero di ore di funzionamento del cogeneratore con relativo aumento di energia termica ed elettrica prodotta da processo di cogenerazione. Il lavoro di tale elaborato è stato svolto presso l’azienda Astea S.p.A. nella sede di Recanati (MC). Nella parte iniziale del lavoro sono stati trattati i concetti di cogenerazione, energia termica, teleriscaldamento, certificati bianchi, sistemi di accumulo ed è stata presentata la centrale di produzione di Osimo. Successivamente, è stata trattata la scelta e la posizione del motore cogenerativo che verrà installato. A seguire sono stati svolti i bilanci energetici sia per il nuovo cogeneratore che per lo storage già presente. Infine, è stato svolto il bilancio economico per entrambi i casi di studio.
File in questo prodotto:
File Dimensione Formato  
Tesi Magistrale - Adriano D'Amelio.pdf

accesso aperto

Descrizione: Allego la mia tesi magistrale
Dimensione 3.67 MB
Formato Adobe PDF
3.67 MB Adobe PDF Visualizza/Apri

I documenti in UNITESI sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12075/10710