This thesis compares precast and cast-in-place reinforced concrete structural systems for the administrative building of the Ricanto Power Plant in Ajaccio, Corsica, using the real precast project as a case study and an equivalent cast-in-place scenario as a benchmark. The two systems are assessed from technical, industrial, economic, scheduling, safety and life cycle (LCA) perspectives. Results show that precast construction is both faster and more cost-effective, with better quality control, while its environmental performance is penalised mainly by the long sea transport of precast elements from Italy to Corsica.
Valutazione comparativa dei sistemi strutturali in cemento armato prefabbricato e gettato in opera per un progetto industriale su larga scala: uno studio di caso di un edificio amministrativo
HEDIBEL, RIMA
2025/2026
Abstract
This thesis compares precast and cast-in-place reinforced concrete structural systems for the administrative building of the Ricanto Power Plant in Ajaccio, Corsica, using the real precast project as a case study and an equivalent cast-in-place scenario as a benchmark. The two systems are assessed from technical, industrial, economic, scheduling, safety and life cycle (LCA) perspectives. Results show that precast construction is both faster and more cost-effective, with better quality control, while its environmental performance is penalised mainly by the long sea transport of precast elements from Italy to Corsica.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
Final Thesis Rima Hedibel PDFA .pdf
non disponibili
Dimensione
6.65 MB
Formato
Adobe PDF
|
6.65 MB | Adobe PDF |
I documenti in UNITESI sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento:
https://hdl.handle.net/20.500.12075/29312