The thesis work is essentially aimed at analysing the risk of fire and the measures to be taken to combat it. Initially, a theoretical overview of the fire and the phases of its development was reported, then proceeding to the indispensable assessment of the fire risk, outlining the possible assessment approaches and the main prevention measures. A general analysis of fire protection systems, types of water reserves, essential piping and different types of protection systems was then carried out. In conclusion, in order to put into effect the above, a case study has been illustrated regarding the fire system of an important international company, that will have to be kept anonymous for reasons of privacy. The analysis of the system was carried out according to the FM standard; first describing the building and the existing plant, verifying the regulatory compliance and finally reporting the hydraulic calculation performed through the namirial program MEP. This study of the facility refers to the work carried out in conjunction with the university course, evaluated as a replacement for the internship.
Il lavoro di tesi è essenzialmente rivolto all'analisi del rischio di incendio e alle misure da adottare per combatterlo. Inizialmente è stata riportata una panoramica teorica sull'incendio e le fasi di sviluppo di quest'ultimo, procedendo poi alla valutazione indispensabile del rischio di incendio, riportando cenni sui possibili approcci di valutazione e le principali misure di prevenzione. Successivamente è stata effettuata un'analisi generica degli impianti antincendio, dei tipi di riserva idrica, piping indispensabile e i diversi tipi di sistemi di protezione. In conclusione, per mettere atto a quanto sopra riportato, si è illustrato un caso studio riguardante l'impianto antincendio di un'importante azienda a stampo internazionale, che dovrà essere mantenuta anonima per motivi di privacy. L'analisi dell'impianto è stata effettuata secondo la normativa FM; descrivendo in primis il fabbricato e l'impianto esistente, verificando la conformità normativa e in conclusione riportando il calcolo idraulico eseguito mediante il programma namirial MEP. Tale studio della struttura si riferisce al lavoro svolto in concomitanza con il corso universitario, valutato in sostituzione del tirocinio.
SISTEMI DI PROTEZIONE E PREVENZIONE ANTINCENDIO CASO STUDIO INTEGRATO: IMPIANTO AZIENDA A STAMPO INTERNAZIONALE
CAPPANNINI, JOELE
2020/2021
Abstract
The thesis work is essentially aimed at analysing the risk of fire and the measures to be taken to combat it. Initially, a theoretical overview of the fire and the phases of its development was reported, then proceeding to the indispensable assessment of the fire risk, outlining the possible assessment approaches and the main prevention measures. A general analysis of fire protection systems, types of water reserves, essential piping and different types of protection systems was then carried out. In conclusion, in order to put into effect the above, a case study has been illustrated regarding the fire system of an important international company, that will have to be kept anonymous for reasons of privacy. The analysis of the system was carried out according to the FM standard; first describing the building and the existing plant, verifying the regulatory compliance and finally reporting the hydraulic calculation performed through the namirial program MEP. This study of the facility refers to the work carried out in conjunction with the university course, evaluated as a replacement for the internship.File | Dimensione | Formato | |
---|---|---|---|
Tesi_Cappannini Joele.pdf
Open Access dal 29/10/2024
Descrizione: Documento di tesi con frontespizio non firmato.
Dimensione
11.54 MB
Formato
Adobe PDF
|
11.54 MB | Adobe PDF | Visualizza/Apri |
I documenti in UNITESI sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/20.500.12075/677